Marks & Spencer – NaRec, Port of Blyth
Client: Shepherd Construction (for One North East)
Sub-Contract Value: £550k
Moorhead Excavations Ltd undertook a Site Preparation contract for Shepherd Construction at the NAREC Site, Blyth Docks.
The site was to be developed from a derelict brownfield expanse of backfilled dry docks into a new offshore Wind Farm Blade Testing Facility.
Moorhead Excavations removed surface Asbestos Cement Debris prior to breaking out & crushing the existing slabbing and underlying dock walls for re-use as a Secondary Aggregate within the new build.
Made Ground deposits were removed from site during a subsequent site levelling exercise with varying degrees of contamination.
On completion of the excavation, the clean crushed materials were re-laid as a site capping and piling platform.
Contamination Included:
• Non-Hazardous Heavy Metals
• Hazardous Hydrocarbon impacted soil hot spots
• Asbestos Insulation-contaminated soils (under controlled conditions).
WHO WE ARE
Some of the best qualified and innovative surveyors and engineers
WHAT WE DO
Services for all aspects of Site Preparation and Enabling Works
RESPONSIBILITY
Committed to Health & Safety, Quality and the Environment
OUR HIGHLY EXPERIENCED TEAM OUR HERE TO HELP
Contact us today to discuss your next project
CALL
0113 279 6556
EMAIL
VISIT
Westfield Court,
Lower Wortley Road,
Leeds, LS12 4PX