Client: Shepherd Construction (for One North East)
Sub-Contract Value: £550k

Moorhead Excavations Ltd undertook a Site Preparation contract for Shepherd Construction at the NAREC Site, Blyth Docks.

The site was to be developed from a derelict brownfield expanse of backfilled dry docks into a new offshore Wind Farm Blade Testing Facility.

Moorhead Excavations removed surface Asbestos Cement Debris prior to breaking out & crushing the existing slabbing and underlying dock walls for re-use as a Secondary Aggregate within the new build.

Made Ground deposits were removed from site during a subsequent site levelling exercise with varying degrees of contamination.

On completion of the excavation, the clean crushed materials were re-laid as a site capping and piling platform.

Contamination Included:

• Non-Hazardous Heavy Metals

• Hazardous Hydrocarbon impacted soil hot spots

• Asbestos Insulation-contaminated soils (under controlled conditions).

WHO WE ARE

Some of the best qualified and innovative surveyors and engineers

Learn More

WHAT WE DO

Services for all aspects of Site Preparation and Enabling Works

Learn More

RESPONSIBILITY

Committed to Health & Safety, Quality and the Environment

Learn More
Achilles
Building Confidence
CHAS
ConstrutionLine
NFDC

OUR HIGHLY EXPERIENCED TEAM OUR HERE TO HELP

Contact us today to discuss your next project

GET IN TOUCH
Moorhead Excavations Logo

CALL

0113 279 6556

EMAIL

VISIT

Westfield Court,
Lower Wortley Road,
Leeds, LS12 4PX

LATEST FROM OUR TWITTER FEED